[1]
NAZIRU, N. and ALABI, I.I. 2026. LONG-TERM LOAD FORECASTING USING ADAPTIVE NEURO-FUZZY INFERENCE SYSTEM: A CASE STUDY OF 330KV MANDO TRANSMISSION STATION, KADUNA, NIGERIA. International Journal of Applied and Advanced Engineering Research. 12, 5 (Jun. 2026). DOI:https://doi.org/10.70382/mejaaer.v12i5.063.