EFFECT OF THE LAST PLANNER SYSTEM ON ROAD PROJECT DELIVERY IN LAGOS STATE, NIGERIA

https://doi.org/10.70382/mejedir.v7i4.020

Authors

  • PEDRO, IBUKUNOLUWA OLUWASEUN Department of Project Management Technology, Federal University of Technology Akure (FUTA), Akure, Ondo State, Nigeria

Abstract

The Last Planner System combines a logistic framework and a visual management framework titled retrofitted KANBAN framework & JIRA respectively to form a resilient independent integrated project delivery system which is underpinned by the lien and agile theory which solve problem by pre-removal of the construction project management system and process errors that may occur in implementing the lien concept of the strategic construction project management stage using its components and can also be interoperable with other project delivery system in which it can track and give account of the: process groups, knowledge areas, health, safety, environment, and information management using a system approach of various project in real time. The aims and objectives of this research is to seek data-driven feedback on the awareness, adoption, and adaptability of the LPS strategies to aid its implementational improvement. The study significance is to unveil industry compliance with international standards, and an eye opener to road construction practitioners' professional bodies to the contribution to United Nations UN SDG 11 of sustainable cities and communities. This study will use a simple random sampling technique for data collection in which 500 questionnaires were distributed while 80% were retrieved representing 400 questionnaires, and served as the basis of analysis using descriptive and inferential statistics. The theoretical relationship of the study through data-driven approach is positive as it relates: Last planner system strategies, its awareness and adaptability effects on road project delivery in Lagos State, Nigeria. The conclusion drawn from this study is that LPS awareness and adaptability has a positive perception, the LPS holds the potential for enhancing project management in road construction. However, the study recommended that: enhance implementation of LPS strategies, bridge the awareness-application gap, improve adaptability of lps and strengthen professional development.

Keywords:

Last Planner System, Agile Frameworks, Visual Management Tool, Awareness, Adoption

Published

2025-01-31

How to Cite

PEDRO, IBUKUNOLUWA OLUWASEUN. (2025). EFFECT OF THE LAST PLANNER SYSTEM ON ROAD PROJECT DELIVERY IN LAGOS STATE, NIGERIA. International Journal of Earth Design and Innovation Research, 7(4). https://doi.org/10.70382/mejedir.v7i4.020